Every construction professional knows that keeping a project on time and on budget is rarely straightforward. With complex supply chains, constant design changes, and multiple subcontractors, visibility becomes a daily challenge. That’s where project controls come in - the systems, processes, and tools that keep projects aligned with their goals from the first pour to final handover.
In 2024, nearly 72% of UK construction projects reported schedule delays and cost overruns averaging 15-20%, according to the Office for National Statistics. The causes weren’t poor intent or lack of skill - they were missing data, late reporting, and weak control over site-level delivery.
What Are Project Controls in Construction?
Project controls are the coordinated methods used to manage cost, schedule, risk, quality, and resources throughout a project’s lifecycle. They create a closed feedback loop between planning and reality - ensuring that what’s happening on site always aligns with what’s on paper.
In practice, that means establishing clear baselines, tracking deviations, and acting on data in real time. Leading firms now pair their master schedules with field-data tools such as Shape’s Weekly Work Planner to link planning, execution, and reporting into one living system.
Why Project Controls Matter More Than Ever
Projects rarely fail because of one major event; they slip because of hundreds of small, untracked changes. A delayed delivery here, a blocked access point there - each pushes the programme slightly off course until the delay becomes visible months later.
Strong project controls prevent that drift. They:
- Keep budgets aligned with live costs.
- Detect schedule variance early enough to act.
- Ensure documentation and evidence meet contractual standards.
- Give project directors confidence that what’s being reported reflects what’s real.
By connecting daily reporting tools like Shape Construction’s Shift Manager to weekly planning, contractors close the loop between field activity and project forecasting - eliminating the blind spots that typically lead to margin loss.
Six Pillars of Effective Project Control
1. Cost Control
Real-time cost visibility is essential. Accurate forecasting depends on capturing actual labour, material, and equipment data daily, not weeks later. Shape’s integrated reporting ensures commercial teams see costs emerging as work happens - not when the invoice arrives.
2. Schedule Control
Schedules only work if they reflect reality. Linking daily progress data to the master plan allows instant visibility of what’s behind, ahead, or stalled. Variance alerts within the Weekly Work Planner help teams adjust before small slippages compound.
3. Scope Control
Unmanaged scope change is one of construction’s biggest profit leaks. Shape’s Change Tracker automatically surfaces potential change events, linking them to evidence such as shift reports and issue logs so teams can defend entitlements confidently.
4. Quality Control
Effective controls ensure design intent and execution match. This includes inspections, RFI tracking, and non-conformance management - all traceable through time-stamped records and photos.
5. Risk Management
Early warning is everything. Dashboards like Shape’s Data Book visualise recurring risks, such as delays or repeated issues by contractor, helping teams intervene before they escalate.
6. Resource & Time Management
Optimising labour and plant allocation prevents idle time. Daily site data feeds performance analytics, revealing where productivity can be improved.
.png)
How to Implement Project Controls That Actually Work
- Set Clear Objectives & KPIs
Define what success looks like - measurable indicators like cost performance index (CPI), schedule variance, and percentage plan complete (PPC). - Digitalise Data Capture
Manual logs and spreadsheets create lag. Using site-friendly apps such as Shift Manager makes reporting fast and consistent, building high-quality datasets for project control teams. - Create Real-Time Feedback Loops
Link weekly planning and daily execution so decisions are made on current data. This is where Shape’s ecosystem excels - connecting planning, delivery, and commercial evidence automatically. - Foster Accountability
Adoption depends on simplicity. Field tools must be intuitive, mobile-ready, and clearly useful for crews - not just management.
Common Roadblocks and How Leading Contractors Overcome Them
- Cultural Resistance: Crews often see new systems as extra work. The key is to show value instantly - for example, faster sign-offs or reduced paperwork.
- Fragmented Data: Using separate systems for communication, scheduling, and reporting causes gaps. Unified platforms such as Shape ensure every update flows into a single source of truth.
- Poor Data Quality: Inconsistent records undermine credibility. Tools that score record completeness, like Shape’s Control Room, make quality visible and enforce standards automatically.
- Executive Disconnect: Without leadership buy-in, controls lose authority. Successful firms make project controls part of leadership KPIs, not optional admin.
Image suggestion 3: Site engineer using a tablet for real-time issue logging while project director reviews metrics on a laptop nearby.
The Role of Digital Platforms in Modern Project Controls
Technology has transformed how project controls operate. Today’s systems unify planning, communication, and evidence capture into one environment.
A connected platform like Shape Construction allows teams to:
- Monitor every change as it happens.
- Automate reports for commercial and progress reviews.
- Track blockers, issues, and delays in one interface.
- Build auditable, high-quality records that protect margin.
Contractors using Shape typically report 66% faster issue resolution and measurable improvements in weekly plan reliability - tangible proof that good data control leads directly to stronger commercial outcomes.
Conclusion
Project controls aren’t paperwork - they’re how contractors stay profitable and predictable in an unpredictable industry. By turning field activity into structured, usable data, teams gain the foresight to manage change, mitigate risk, and protect every pound of margin.
That’s exactly what Shape Construction was built for: connecting the daily reality of site delivery with the commercial and planning controls that keep projects performing.
Frequently Asked Questions
They manage the relationship between cost, time, quality, and risk. Many contractors now use Shape’s connected tools to centralise these functions, giving management full visibility of site performance.
By preventing unrecorded change and delay. Shape’s Change Tracker automatically compiles the evidence required for claims, ensuring legitimate costs are recovered.
The best systems link planning, reporting, and issue tracking in one ecosystem. Shape Construction does exactly that - integrating shift reports, weekly plans, and commercial data into a single, traceable workflow.
Often because the tools are too complex for site teams. Shape’s mobile-first design solves this by making reporting and communication effortless for crews, ensuring adoption across all levels.
Real-time variance alerts and progress dashboards identify slippage early. When integrated with Shape’s Weekly Work Planner, these controls help teams adjust sequencing before problems grow.